Building Survey Australian Standards of Assessment

Total Length: 1627 words ( 5 double-spaced pages)

Total Sources: 5

Page 1 of 5

Building Surveying assessment; , 5Task 1a. All documentation for boarding house in Marrickville Councili. Cost of Works – fee costii. Structural Engineer certificate or Party Wall Consentiii. Plans· Site Plan· Site Analysis Plan· Roof and Floor Plans· Survey Plan· Landscape Plan· Sections and Elevations· Notification Plans· Shadow Diagrams· Storm water Drainage Concept Plan· Vehicle Access and Car Parking Plans· Subdivision Plan· Extra Solar Access Prerequisitesiv. Supporting Documentation· BASIX Certificate· Environmental Effects Statement· Arborist Report· Flood Risk Management Report· Water Management Statement· Heritage Impact Statement· Foreshore Risk Management Report· Conservation Management Plan· Waste Management Plan· Structural Engineer’s Construction Methodology and Report· SEPP65 – Developments· Development Standards Exceptions· Fire Safety Schedule· Geotechnical Report· Access Report· RAP in case of Contaminated Land· Acoustic Report· Parking and Traffic Assessment· Social Impact Assessment· 3D Model· Photomontage and· Sample and Materials Board Management Plan (Inner west Council N.D.a)The extant application lacks a few key plans and supporting documentation mandated by the Inner West (Marrickeville) Council for development application. Particularly, it lacks a storm water Drainage Concept Plan and the council does not provide its approval for incomplete applications.b. Compliance with statutory requirementsAffordable Rental Housing or State Environmental Planning Policy (SEPP) 2009 constitutes the key legislation permitting boarding houses. SEPP offers a set of boarding house standards whose compliance may not be utilized for refusing boarding houses (Marrickville Council N.D.a). The 2011 Marrickville Development Control Plan’s A.2.6 mandates drainage plans in case of boarding houses. The development application in question lacks such a plan, which leads to the conclusion that the application fails to adhere to Marrickville council’s development planning statutory requirements.c. Council documentation requirements compared to legislationYes, Marrickville Council has more documentation requirements than what the law requires. The legislature concerned with Marrickville Council development planning includes; the 1993 Development Act, Building Code of Australia, New Zealand/Australian Standards, the 2008 Development Regulation, the 1999 Local Government Act, the 2016 Planning, Development and Infrastructure Act 2016, and the 2016 Local Nuisance and Litter Control Act. For compliance with the above legislature, Marrickville Council outlines additional documents which must be presented for guaranteeing compliance according to regional conditions and circumstances. Local Australian councils possess statutory control over development approval procedures and land-use zoning. Moreover, they are required to formulate and put local and strategic plans into effect (Yigitcanlar 2006). This, thus, makes it mandatory for the council to require additional development planning-related documentation.d. Council development application checklisti. Details and Plans to be presented before the council· Survey plan· Context analysis and site report and plan· Scaled plans, sections and elevations· A4 sized elevations and plans· Finish and color schedule· Drainage plan· Landscape plan· Shadow diagrams· Subdivision plan· Sediment and erosion plan· Photo montages and photographs· Waste management and recycling planii. BASIXii. Environmental effects statementiii. SEPP 65 assessmentiv. Minimum lodgment conditionsv. Plan of Managementvi. BCA (Building Code of Australia) compliance report (Marrickville Council, N.D.b)Task 2: Compliance assessment reportEvery external work’s development application needs to encompass an exterior finish and color schedule, presented as material and colour samples or manufacturer code-bearing trade brochures placed neatly atop a sample board. Materials and colours presented need to be referenced carefully to every planned elevation. The sample board’s coloured copies need to be included in the application as well. The existing application lacks a finish and color schedule as…

[…… parts of this paper are missing, click here to view the entire document ]

…to appropriate Environment, Water and Climate Change Departmental guidelines, describing remediation to the areas the development impacts, and validated to ensure all contamination on the site is managed appropriately.

Stuck Writing Your "Building Survey Australian Standards of Assessment" ?

Evidence on these matters needs to be put forward before the Council’s delegate or the Council itself within a couple of years from the determination’s date, failing which the consent lapses (Marrickville Council, N.D.a).b. A deferred commencement for this projectThe development consent will be inoperable if the following elements are addressed to the Council’s satisfaction: A license of allocation must be acquired for the land, for utilizing site resources as the council did, and as recommended by the council’s department. The allocation must be acquired prior to a lapse of 2 years or the consent will expire.Task 5: Legislative and council requirements for the notificationThe minimum development application notification standard is:· Forwarding a notice, in writing, to adjacent lands’ occupiers and owners, as well as to occupiers and owners of lands right across a road or street. The Council will bank on its own property system during notice compilation for identifying land owners;· Placement of a sign as notice on the land;· Listing the development application within a locally circulated newspaper; and· Adherence to a two-week notification period (which will be extended to three weeks during Christmas and Easter) (Marrickville Council N.D.b).The council may vary the aforementioned process and permit:· Notifications to properties besides neighboring properties;· Extension of notification period;· Organizing a public meeting· Listing of the application within a locally circulated newspaper;· Exhibition of plans and designs at other open/public places;· Changing the recommendations the written notification contains; and· Consulting with appropriate community….....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment" (2018, April 29) Retrieved May 20, 2024, from
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177703

Latest MLA Format (8th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment" 29 April 2018. Web.20 May. 2024. <
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177703>

Latest Chicago Format (16th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment", 29 April 2018, Accessed.20 May. 2024,
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177703