Strategic assessment

2. Project Preparation

3. Project Implementation'

4. Facility Operation

These four assessment tools are to be standalone tools that are applied at specific stages of the Gipsy Lane brickworks road extension and the industrial development project life cycle. The assessment with one of the tools has no link or dependence with earlier stages. The tools of assessment are to be designed in a manner that they are applicable throughout the planning stage up to the point of making decisions in the project life cycle (See figure 1.).

The process of protocol assessment (Source: IHA, 2010).

The tools are to undergo repeated application so as to help in the continuous improvement of the process.

Strategic Assessments section

This section is important for the assessment of the strategic basis of the Gipsy Lane brickworks project. This part is most applicable at the stage when the Gipsy Lane brickworks is still under consideration and no clear cut decisions have been made in order to invest in the project. The reasons for this are because probably no public statements have been released regarding the project, the project has not yet been tendered for the initial engineering design operations. The purpose of this section of the protocol is to inform the stakeholders and the public that there exists a strategic basis for progressing with project preparation and also to make it certain that the risks involved are manageable.

Project Preparation section

This section is important since it is used to assess the preparation stage of the Gipsy Lane brickworks project. In this stage, the team members investigate, plan as well as design all the important aspects of the project. After project preparation, another critical move, the making of decision to proceed with the awarding of construction contracts follows. The assessment that is conducted at this stage assesses if all of the preparatory requirement/conditions have been fulfilled, plans of management are laid down and the commitment is both appropriate as well as binding. This part of the protocol can be employed prior to as well as to inform the process of decision-making to proceed forward with the implementation of the project. After this section, the construction begins along the appropriate environmental and socio-economic action plans (considerations)

Project implementation section

This section is important for the success of the Gipsy Lane brickworks project since it makes an elaborate assessment of the implementation stage of the project. It monitors how the construction, plans of resettlement, road diversion plans, management and other environmental plans are implemented. The commissioning of the Gipsy Lane brickworks project enables it to begin serving the public. The assessment that is made before the commissioning of the Gipsy Lane brickworks project makes it possible to assess if all project commitments/requirements have been met.

Project operation section

This stage assesses the nature and extent of operation of the Gipsy Lane brickworks project facility.

Stuck Writing Your "Environmental Assessment Is an Integral" Research Proposal?

This phase of the protocol is important since it can be used to gauge if the facility is functioning on a sustainable basis while all the active measures have been placed to monitor compliance for the purpose of improving the performance of the facility on a continual basis.

The implementation of the protocol

After the project has fully been adopted, it would be necessary to develop and formalize the appropriate structures that are integral to its management and implementation. There are four major strategic objectives that are important for the success of the protocol implementation. The first one is the widespread application of the protocol in order to promote sustainable construction and development. The second one would be the need to train as well as increase awareness on the protocol through efforts of project partners. The fourth one would be ensuring of transparency in the management as well as the governance of the developed protocol. This is extended to the associated activities and must be executed on a self-financing regime.

In order to realize these objectives, the company carrying out the project must work together with organizations and the community in the development of the necessary governance plans for the protocol.

In order for an assessment to be taken for a project, it must be at its initial or final stages. The assessment must have a future perspective or should scrutinize the past activities. The Protocol should be designed for conducting repeat operations. An assessment that is carried out in the initial stages of a project can help in the improvement of the later stages. An overlap may occur in the project life cycle. This is to say that implementation operations may take place at the time of project preparations, like the commissioning additional sidewalks, while the implementation operations are progressing. Should a project be in transition stage, then the assessment tool's choice heavily depends on the purpose of the project assessment itself. Road construction an industrial construction projects possess extensive lifespan. The Strategic Assessments tools can act as a source of guidance on certain important considerations that must be taken into account for making of decisions regarding the facility or the re-optimization of the transmission network, extension of life of the facility or decommissioning of the facility. In case there is a need of performing refurbishments, the Project Preparation section would come in handy. The Project Operation assessment section is important during re-licensing as well as in times of minor refurbishments......

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Environmental Assessment Is An Integral" (2011, May 09) Retrieved May 18, 2024, from
https://www.aceyourpaper.com/essays/environmental-assessment-integral-44452

Latest MLA Format (8th edition)

Copy Reference
"Environmental Assessment Is An Integral" 09 May 2011. Web.18 May. 2024. <
https://www.aceyourpaper.com/essays/environmental-assessment-integral-44452>

Latest Chicago Format (16th edition)

Copy Reference
"Environmental Assessment Is An Integral", 09 May 2011, Accessed.18 May. 2024,
https://www.aceyourpaper.com/essays/environmental-assessment-integral-44452