Production Engineering -- Summary the Term Paper

Total Length: 471 words ( 2 double-spaced pages)

Total Sources: 0

Page 1 of 2

Ideal fracture geometry differs depending on the relative permeability conditions. Reservoir length is the most important dimension in low-permeability reservoirs, whereas reservoir width is more important in high-permeability reservoirs.

Artificial Lift

In general, the objective of artificial lift processes is to reduce the bottom hole flow pressure by increasing the flow rate. The Gas Lift method relies on gas compressor systems controlled by valve systems and produces oil and gas at the surface. Beam pumping has been used in its most conventional form, relies on gravity-based beam pumping units used by the industry since the 19th century. Various more modern forms of beam pumping systems include unitorque, air-balanced, and low-profile pumping unit configurations.

Stuck Writing Your "Production Engineering -- Summary The" Term Paper?



More recently, the electrical submersible method was developed and it can be advantageous in various operational environments and conditions. More particularly, electrical submersible pumps can lift high volumes of product at lower cost per volume; they are simpler to operate; and have much smaller and less obtrusive profiles above the surface. Conversely, this method (obviously) depends on the availability and affordability of electric current and at high voltages and it is generally limited to a maximum reservoir depth of 10,000-foot depth. Other limitations and potential complications that must be considered are potential problems caused by the electric cable, limitations in the maximum casing size, and flow problems caused by gaseous and….....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Production Engineering -- Summary The" (2012, April 23) Retrieved May 20, 2025, from
https://www.aceyourpaper.com/essays/production-engineering-summary-56423

Latest MLA Format (8th edition)

Copy Reference
"Production Engineering -- Summary The" 23 April 2012. Web.20 May. 2025. <
https://www.aceyourpaper.com/essays/production-engineering-summary-56423>

Latest Chicago Format (16th edition)

Copy Reference
"Production Engineering -- Summary The", 23 April 2012, Accessed.20 May. 2025,
https://www.aceyourpaper.com/essays/production-engineering-summary-56423