Transit Projects Analysis and Evaluation

Total Length: 2685 words ( 9 double-spaced pages)

Total Sources: 2

Page 1 of 9

Project Management- Natural Soap

Project Charter

atural Soaps Project>

As such, there is a great need for taking care of the human skin. In the present times, there has been a great recognition and inclination for natural products which are made of natural extracts such as aloe vera. Taking this into consideration, this particular project seeks to come up with natural product soaps, both scented and non-scented to cater to the new needs of the consumers.

2. Pollution

Manufacturing companies for a long time have been scrutinized for the pollutants that are emitted to the environment resulting from their processing activities. However, this aspect has lately become a big issue with the aspect of climate change. This project seeks to refine or fine-tune the manufacturing practices by coming up with ways that are not harmful to the environment in any way.

Project Environment

This section of the survey describes the project environment in terms of project participants, problems, and opportunities to be addressed, and project constraints that will or may limit eventual solutions. Figure 1 represents a context diagram of the current system.

1. Management - Direct Users or Managers of the System

a. Steve Hanely

Management Director of Natural Soaps Project

2. <

epeat the above list pattern for all management users who are direct users of the system. Next (in item #2 below), list all non-management participants. Non-management participants include clerks, secretaries, office help, administrative assistants, any anybody else who works within the system being studied.>Non-Management - Direct Users of the System

a. Jane Connoly

Consumer Product Tester for Direct Consumer Feedback<

epeat the above list pattern for all non-management users who are direct users of the system. Next, list the names of people or departments who may be affected by or interested in the system that will be studied and/or modified.>

3. Other People or Departments Affected by, Interested in, or Interfacing to the System

a. Jacob Olsen

Manager of the Soap manufacturing Department

b. Christine Hanks

Director and Manager of Corporate social Responsibility

<

epeat the above list pattern for all people or departments who are affected by the system.>

Problems and Opportunities. I have compiled the following list of problems and opportunities to be addressed in the project. The list is not final. In the coming weeks, I will modify the list and provide you with a detailed analysis of problems, opportunities, and solutions. At any time during this project, you should feel free to add to, subtract from, or expand upon this preliminary list.

1. One of the problems addressed in this project is the aspect of pollution. With the aspect of sustainability and the need to take care of the environment, the project comes up with ways to produce the products that are not harmful to the environment or bring about pollutants (Shrivastava, 1995).

2. The project also takes into consideration the need to come up with natural products. In the contemporary times, there is greater necessity and demand from the consumers for natural products devoid of any additives or condiments that are manufactures. The project will come up with products that are created purely from natural extracts and that are healthy and good for the human skin.

Project Constraints. Project constraints are limitations, good or bad, that will or may affect any solutions that I might propose. Constraints can be technical, monetary, time, or political. As of now, I have….....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Transit Projects Analysis And Evaluation" (2015, September 29) Retrieved May 17, 2024, from
https://www.aceyourpaper.com/essays/transit-projects-analysis-evaluation-2154576

Latest MLA Format (8th edition)

Copy Reference
"Transit Projects Analysis And Evaluation" 29 September 2015. Web.17 May. 2024. <
https://www.aceyourpaper.com/essays/transit-projects-analysis-evaluation-2154576>

Latest Chicago Format (16th edition)

Copy Reference
"Transit Projects Analysis And Evaluation", 29 September 2015, Accessed.17 May. 2024,
https://www.aceyourpaper.com/essays/transit-projects-analysis-evaluation-2154576