CEO Office Remodel Project Overview Term Paper

Total Length: 773 words ( 3 double-spaced pages)

Total Sources: 1+

Page 1 of 3

This is to be enabled through use of the Media Center PC Universal Remote Control and Compact Keyboard Suite and its integrated keyboard and remote control system. This system, while taking a 'little getting used to' (CNET, 2007) will allow for theater presentations from the laptop PC. The cost for this system is approximately $200.00. In order to enable video productions directly from the CEO's laptop proposed is the purchase of FlyImage5000. This purchase will enable wireless computer to TV connection for the purpose of displaying computer presentations, online video presentations, video conferencing, multimedia education, as well as, if needed in the future, multiple TV reception of any AV signal from a PC, DVD player, satellite receiver and set-top box.

III. PARTS LIST

1) Norcent LT-3751 37" LCD HDTV 1000:1 Contrast Ration LT3751BLK

Located online Buy.

Stuck Writing Your "CEO Office Remodel Project Overview" Term Paper?

com. Available at http://www.buy.com/prod/norcent-lt-3751-37-lcd-hdtv-1000-1-contrast-ratio/q/loc/111/203386684.html?dcaid=17873

Cost: $873.39 (Free Shipping)

2) FlyImage5000

Located Online Available at http://pctotvconverter.com/buyitnow.php

Cost: $134.99 (Shipping Included)

3) Remote Control and Compact keyboard Suite"

Part number GPR6105ck

Located Online Available at http://reviews.cnet.com/keyboards/gyration-media-center-pc/4505-3134_7-32331445.html

Cost: $200.00

4) Logitech MX Air Mouse

Available Online at http://review.zdnet.com/mice/logitech-mx-air/4505-3148_16-32509522.html

Cost: $149.00 (Shipping Included)

Total Cost: $1,358.79.....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"CEO Office Remodel Project Overview" (2007, September 03) Retrieved June 4, 2026, from
https://www.aceyourpaper.com/essays/ceo-office-remodel-project-overview-35989

Latest MLA Format (8th edition)

Copy Reference
"CEO Office Remodel Project Overview" 03 September 2007. Web.4 June. 2026. <
https://www.aceyourpaper.com/essays/ceo-office-remodel-project-overview-35989>

Latest Chicago Format (16th edition)

Copy Reference
"CEO Office Remodel Project Overview", 03 September 2007, Accessed.4 June. 2026,
https://www.aceyourpaper.com/essays/ceo-office-remodel-project-overview-35989