Productivity and Process Improvement Plan Essay

Total Length: 961 words ( 3 double-spaced pages)

Total Sources: 0

Page 1 of 3

Improving Efficiency in Product Manufacturing:

A Case Study of EMC's Plasti-brack

Excellent Manufacturing Company's goal this year is to improve overall efficiency by 8%. Having looked at the manufacturing processes and organization dynamics, I believe this is an achievable goal. My area -- the Plasti-brack product line -- has several productivity indicators that can be improved, which will save EMC time and cost, and contribute to better consumer value. In the following productivity improvement plan, I will identify areas that are currently highly productive, areas in which productivity can be enhanced, quantitative measurements of the productivity of processes involved in Plasti-brack manufacture, and provide a plan for how these processes can be improved.

Basic Process Improvement

A first-pass analysis should lay the groundwork for productivity improvement: What indicators exist that can be improved? In the processes that are central to or connect to Plasti-brack manufacture and packaging, the most relevant productivity indicators are (in the form of Output / Input):

S90 / Ft. Raw steel coil: This indicator reflects the productivity of the S90 presses.

P90 / Gm. Raw plastic: This indicator reflects the productivity of the P90 injection molding process. As of the current analysis, information about these indicators (namely, the amount of steel coil and raw plastic used as input for essential P90 output) was not available.

F90 / S90: This indicator will reflect the productivity of the S90 manufacturing process and part of the F90 assembly process.

Stuck Writing Your "Productivity and Process Improvement Plan" Essay?

In terms of time, currently this indicator's value is 480/400, or 1.2. This simply means that the number of assembled F90s that can be produced is 20% more than the S90 input it is receiving from the steel bracket presses.

F90 / P90: This indicator will reflect the productivity of the P90 molding process and Currently this indicator's value is somewhat better, at 480/720 or 0.67. In other words, the F90 assembly line is handling about two thirds of the input from the plastic injection molding stations.

B-F90 / F90: This indicator will reflect the efficiency of the transition from F90 assembly to bulk packaging. Currently this indicator's value is near 0.1, since the packaging line can only receive assembled F90s at a rate of 480 per hour, but the total processing power of the packaging line is 4,830 pieces per hour, or roughly 12 cases of B-F90s per hour.

So, clearly the "worst cases" in the P90 assembly process are the transitions from steel bracket production to F90 assembly, and the provision of fully assembled F90s to the bulk packaging stations. EMC should seriously consider investing in an expanded assembly team, or re-engineering the bracket production process in order to eliminate quality control checks using the "mistake-proofing" methods used so successfully by Toyota and other Japanese manufacturers.

If the F90 line was to perform at top efficiency, the current injection molding capacity and….....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Productivity And Process Improvement Plan" (2011, April 17) Retrieved June 4, 2026, from
https://www.aceyourpaper.com/essays/productivity-process-improvement-plan-119840

Latest MLA Format (8th edition)

Copy Reference
"Productivity And Process Improvement Plan" 17 April 2011. Web.4 June. 2026. <
https://www.aceyourpaper.com/essays/productivity-process-improvement-plan-119840>

Latest Chicago Format (16th edition)

Copy Reference
"Productivity And Process Improvement Plan", 17 April 2011, Accessed.4 June. 2026,
https://www.aceyourpaper.com/essays/productivity-process-improvement-plan-119840